Change all license headers to comply with REUSE specification.
Fix#16132
Co-authored-by: flynnnnnnnnnn <flynnnnnnnnnn@github>
Co-authored-by: John Olheiser <john.olheiser@gmail.com>
Continues on from #19202.
Following the addition of pprof labels we can now more easily understand the relationship between a goroutine and the requests that spawn them.
This PR takes advantage of the labels and adds a few others, then provides a mechanism for the monitoring page to query the pprof goroutine profile.
The binary profile that results from this profile is immediately piped in to the google library for parsing this and then stack traces are formed for the goroutines.
If the goroutine is within a context or has been created from a goroutine within a process context it will acquire the process description labels for that process.
The goroutines are mapped with there associate pids and any that do not have an associated pid are placed in a group at the bottom as unbound.
In this way we should be able to more easily examine goroutines that have been stuck.
A manager command `gitea manager processes` is also provided that can export the processes (with or without stacktraces) to the command line.
Signed-off-by: Andrew Thornton <art27@cantab.net>
Currently Gitea will wait for HammerTime or nice shutdown if kill -1 or kill -2
is sent. We should just immediately hammer if there is a second kill.
Signed-off-by: Andrew Thornton <art27@cantab.net>
* move shutdownfns, terminatefns and hammerfns out of separate goroutines
Coalesce the shutdownfns etc into a list of functions that get run at shutdown
rather then have them run at goroutines blocked on selects.
This may help reduce the background select/poll load in certain
configurations.
* The LevelDB queues can actually wait on empty instead of polling
Slight refactor to cause leveldb queues to wait on empty instead of polling.
* Shutdown the shadow level queue once it is empty
* Remove bytefifo additional goroutine for readToChan as it can just be run in run
* Remove additional removeWorkers goroutine for workers
* Simplify the AtShutdown and AtTerminate functions and add Channel Flusher
* Add shutdown flusher to CUQ
* move persistable channel shutdown stuff to Shutdown Fn
* Ensure that UPCQ has the correct config
* handle shutdown during the flushing
* reduce risk of race between zeroBoost and addWorkers
* prevent double shutdown
Signed-off-by: Andrew Thornton <art27@cantab.net>
* Make LogDescriptions race safe
* Add manager commands for pausing, resuming, adding and removing loggers
Signed-off-by: Andrew Thornton <art27@cantab.net>
* Placate lint
* Ensure that file logger is run!
* Add support for smtp and conn
Signed-off-by: Andrew Thornton <art27@cantab.net>
* Add release-and-reopen
Signed-off-by: Andrew Thornton <art27@cantab.net>
Co-authored-by: techknowlogick <techknowlogick@gitea.io>
Co-authored-by: Lauris BH <lauris@nix.lv>
* Make WorkerPools and Queues flushable
Adds Flush methods to Queues and the WorkerPool
Further abstracts the WorkerPool
Adds a final step to Flush the queues in the defer from PrintCurrentTest
Fixes an issue with Settings inheritance in queues
Signed-off-by: Andrew Thornton <art27@cantab.net>
* Change to for loop
* Add IsEmpty and begin just making the queues composed WorkerPools
* subsume workerpool into the queues and create a flushable interface
* Add manager command
* Move flushall to queue.Manager and add to testlogger
* As per @guillep2k
* as per @guillep2k
* Just make queues all implement flushable and clean up the wrapped queue flushes
* cope with no timeout
Co-authored-by: Lauris BH <lauris@nix.lv>
* Change graceful to use a singleton obtained through GetManager instead of a global.
* Graceful: Make TestPullRequests shutdownable
* Graceful: Make the cron tasks graceful
* Graceful: AddTestPullRequest run in graceful ctx
* Graceful: SyncMirrors shutdown
* Graceful: SetDefaultContext for Xorm to be HammerContext
* Avoid starting graceful for migrate commands and checkout
* Graceful: DeliverHooks now can be shutdown
* Fix multiple syncing errors in modules/sync/UniqueQueue & Make UniqueQueue closable
* Begin the process of making the repo indexer shutdown gracefully
* Graceful: Create callbacks to with contexts
* Graceful: Say when Gitea is completely finished
* Graceful: Git and Process within HammerTime
Force all git commands to terminate at HammerTime
Force all process commands to terminate at HammerTime
Move almost all git processes to run as git Commands
* Graceful: Always Hammer after Shutdown
* ProcessManager: Add cancel functionality
* Fix tests
* Make sure that process.Manager.Kill() cancels
* Make threadsafe access to Processes and remove own unused Kill
* Remove cmd from the process manager as it is no longer used
* the default context is the correct context
* get rid of double till
* Graceful Shutdown for windows and others
Restructures modules/graceful, adding shutdown for windows, removing and
replacing the old minwinsvc code.
Creates a new waitGroup - terminate which allows for goroutines to
finish up after the shutdown of the servers.
Shutdown and terminate hooks are added for goroutines.
* Remove unused functions - these can be added in a different PR
* Add startup timeout functionality
* Document STARTUP_TIMEOUT